Work · the spec slate

14 ads built for Elfonze

Seven for Kairos11 and seven for Karman11. Each one goes after something you raised on the November 17 call, like reaching planners Meta can’t target by job title, or a gap in the competitor ads: nobody shows the moment a schedule breaks or the chase for supplier data. Every problem line is a buyer’s own words from Reddit, and no two ads share a layout.

These are spec drafts. Claims stay inside your one-pagers. The photos were generated for these drafts, and for launch we’d use your own plants, people and product wherever you have them.

14
spec ads
7
Kairos11
7
Karman11
0
customer names or results claimed
Kairos11
One job slips and every job after it slips too.
Spec ad 01, render coming
01. Kairos11: One job slips and every job after it slips too.
01 · Kairos11 · Falling blocks
One job slips and every job after it slips too.
Who
Production scheduler who keeps the schedule in Excel
Problem
If something doesn’t run and gets pushed to the next day, I have to do the painstaking task of cutting and pasting rows to the next day and turns into a domino effect r/manufacturing
In the ad
Heavy steel blocks falling like dominoes down a dark plant floor, one orange block holding the line.
Why: The moment the schedule breaks, drawn as the domino effect a scheduler described. No competitor shows it.
Karman11
Half your suppliers never send the carbon data.
Spec ad 02, render coming
02. Karman11: Half your suppliers never send the carbon data.
02 · Karman11 · Flat lay
Half your suppliers never send the carbon data.
Who
Sustainability manager chasing suppliers for Scope 3 data
Problem
Half the vendors don’t respond, and the other half send back broken templates or raw numbers that take forever to clean up. r/carbonaccounting
In the ad
A long table of printed supplier carbon forms, almost all of them blank.
Why: Supplier data chasing gets named in carbon ads and never shown. The layout is the longest-running ad in your category.
Kairos11
Sales just sent another rush order.
Spec ad 03, render coming
03. Kairos11: Sales just sent another rush order.
03 · Kairos11 · Close-up
Sales just sent another rush order.
Who
Planner buried in rush orders
Problem
At one point we had ’HOT’ and ’LAVA HOT’. I’m surprised we didn’t add ’PLASMA HOT’. r/manufacturing
In the ad
Job tickets clipped to a machine, the top one marked HOT and LAVA HOT in red.
Why: The what-if test from your one-pager, shown on the order that causes the trouble.
Karman11
Hundreds of utility bills. All while prepping for year end.
Spec ad 04, render coming
04. Karman11: Hundreds of utility bills. All while prepping for year end.
04 · Karman11 · Night office
Hundreds of utility bills. All while prepping for year end.
Who
Finance controller handed emissions tracking on top of the day job
Problem
we have to pull utility statements for two years for our thirty branch location operation.....ie hundreds of utility bills all while prepping for year end. r/Accounting
In the ad
A corner office at night, towers of utility bills on the desk.
Why: Built from ERP data you already have. No carbon tool says it, and finance is a buyer your one-pager names.
Kairos11
Blamed for moving the schedule again.
Spec ad 05, render coming
05. Kairos11: Blamed for moving the schedule again.
05 · Kairos11 · Over the shoulder
Blamed for moving the schedule again.
Who
Scheduler who gets blamed when the plan changes
Problem
I constantly get blamed for moving things around. First of all, that’s my job. r/supplychain
In the ad
A planner at the glass, looking down on a car body plant.
Why: Answers your targeting question on the call: the job and the problem are named in the copy, so Meta finds the people who stop for it.
Karman11
Your cleanest supplier gets the same carbon score as your dirtiest.
Spec ad 06, render coming
06. Karman11: Your cleanest supplier gets the same carbon score as your dirtiest.
06 · Karman11 · Data board
Your cleanest supplier gets the same carbon score as your dirtiest.
Who
Procurement or sustainability lead
Problem
One of our chemical suppliers invested heavily in cleaner processes and another hasn’t changed anything in a decade, but our methodology assigns them the same emission intensity per dollar spent. That feels wrong. r/sustainability
In the ad
Two dotted terrains side by side: suppliers scored on spend, then on real data.
Why: Spend-based estimates against real supplier data, the first row of the before-and-after table on your one-pager.
Kairos11
Press 4 just went down.
Spec ad 07, render coming
07. Kairos11: Press 4 just went down.
07 · Kairos11 · Floor from above
Press 4 just went down.
Who
Plant manager
Problem
Our scheduling gets judged on machine utilisation... idle time gets questioned in the meeting. r/manufacturing
In the ad
A dark plant floor from above, Press 4 down, orange lines routing its jobs to other machines.
Why: Your four steps (sense, reason, re-schedule, write back) on the moment a machine stops, with the person approving each move.
Karman11
Your EU buyers now pay for the carbon in your steel.
Spec ad 08, render coming
08. Karman11: Your EU buyers now pay for the carbon in your steel.
08 · Karman11 · Hand-marked steel
Your EU buyers now pay for the carbon in your steel.
Who
Exporter of steel or aluminium to the EU
Problem
my importers have started asking for embedded emissions data (direct + indirect) for their annual declarations. r/exportersindia
In the ad
Steel coils at dusk, the nearest one marked by hand in paint marker.
Why: Exporters are one of the three buyers on your one-pager. Nobody advertises carbon data to them.
Kairos11
One hour of downtime on a car line costs $2.3M.
Spec ad 09, render coming
09. Kairos11: One hour of downtime on a car line costs $2.3M.
09 · Kairos11 · Painted floor
One hour of downtime on a car line costs $2.3M.
Who
Plant head or operations leader
Problem
One hour down and everyone loses their perfect numbers r/manufacturing
In the ad
“$2.3M” painted on a car plant floor, two workers walking over it.
Why: Recovery in minutes, which nobody sells. The $2.3M is from Siemens, The True Cost of Downtime 2024, as cited on your one-pager.
Karman11
Scope 3 plan: publish and hope nobody asks
Spec ad 10, render coming
10. Karman11: Scope 3 plan: publish and hope nobody asks
10 · Karman11 · Whiteboard
Scope 3 plan: publish and hope nobody asks
Who
Sustainability lead facing an auditor
Problem
publish and hope category here, honestly. Our auditor accepted spend-based methodology for this year but flagged that they expect more supplier-specific data in the next reporting cycle. r/sustainability
In the ad
A real whiteboard, with “publish and hope” circled in marker.
Why: Uses the buyer’s words for the audit trail instead of “audit-ready”, which every carbon tool says.
Kairos11
The ERP says 500. The rack has 50.
Spec ad 11, render coming
11. Kairos11: The ERP says 500. The rack has 50.
11 · Kairos11 · Lit doorway
The ERP says 500. The rack has 50.
Who
Supply chain leader
Problem
the ERP system says we have 500 units when physically there’s maybe 50 r/manufacturing
In the ad
A giant “500” cut out of a dark warehouse as a doorway of light, a nearly empty rack behind it.
Why: Keep the ERP you have. Every competitor sells a replacement; your one-pager says no rip and replace.
Karman11
The report got filed. The carbon didn’t go down.
Spec ad 12, render coming
12. Karman11: The report got filed. The carbon didn't go down.
12 · Karman11 · Objects as a chart
The report got filed. The carbon didn’t go down.
Who
Head of sustainability or CFO
Problem
The consultant signed off and went into the annual report, but honestly I don’t know how accurate it is. r/sustainability
In the ad
Shipping containers at a port stacked as a falling bar chart, with five numbered cuts.
Why: Carbon as a cost decision: cuts ranked by carbon saved and money. No carbon ad shows a ranked list.
Kairos11
80% of the time I’m running around the shop floor.
Spec ad 13, render coming
13. Kairos11: 80% of the time I'm running around the shop floor.
13 · Kairos11 · Isometric drawing
80% of the time I’m running around the shop floor.
Who
Production supervisor on the floor
Problem
80% of the time I’m running around the shop floor trying to figure out how delayed jobs are and updating the schedule accordingly. r/manufacturing
In the ad
A drawing of the line: castings late, the CNCs waiting, assembly sitting idle.
Why: The supervisor’s own words, with the knock-on effect of one late delivery drawn step by step.
Karman11
26× more carbon in your supply chain than in your own plants.
Spec ad 14, render coming
14. Karman11: 26 times more carbon in your supply chain than in your own plants.
14 · Karman11 · Globe
26× more carbon in your supply chain than in your own plants.
Who
Listed company or large manufacturer
Problem
The hardest thing has been data collection and hell lotta missing data. It mostly happens in the case of scope 3 emissions r/carbonaccounting
In the ad
Earth at night, supplier routes converging on one plant.
Why: Built from purchase records and supplier data. The 26× is from CDP and BCG 2024, as cited on your one-pager.

To confirm with you before any of these run

Spec drafts, built from the November 17 call, the Kairos11 and Karman11 one-pagers, the Meta Ad Library and Reddit. Before any of them spends money, we’d confirm:
  • Every photo: generated for these drafts. Where you have real plants, people or product, we’d use those before launch.
  • Kairos11 claims (01, 03, 05, 07, 09, 11, 13): a new schedule in minutes, a plain-language reason for every job it moves, you approve each move, and it checks what’s really on the floor. All are on your one-pager. We’d check they hold for a new customer, beyond the pilots.
  • Karman11 claims (02, 04, 06, 08, 10, 12, 14): carbon worked out from what you bought and your ERP data, suppliers scored on real data, the source of every number and ranked cuts. All are on your one-pager. Karman11 isn’t on elfonze.com yet, so it needs a page before its ads run.
  • 09 and 14: the $2.3M (Siemens, The True Cost of Downtime 2024) and the 26× (CDP and BCG, 2024) come from your one-pagers and are printed with their sources on the ads.
  • Every ad: needs a landing page with a form tracked in Meta as a lead.

14 ads, two products, one test.

We’d go through them on the next call with you and your partners.

×